Appraisal Repairs

Chimney Step Flashing & Counter-Flashing Repairs for Appraisal Roof Certifications

Complete compliance and contractor execution playbook for chimney step & reglet counter-flashing installation under IRC R903.2 Flashing. Typical cost: $350–$900, turnaround: 1–2d, with full Form 1004D verification steps.

AT
AppraisalFix Team
October 27, 2026 7 min read
Chimney Step Flashing & Counter-Flashing Repairs for Appraisal Roof Certifications

Why Chimney Step & Reglet Counter-Flashing Installation Triggers "Subject To" Appraisal Conditions

When a residential mortgage appraisal is completed under IRC R903.2 Flashing, any deficiency involving chimney step & reglet counter-flashing installation shifts the report from "As-Is" to "Subject To" repair or inspection. Unlike general home inspection negotiation items, an appraisal condition tied to chimney step & reglet counter-flashing installation is a hard underwriting gate that must be resolved and verified—typically via Fannie Mae Form 1004D / Freddie Mac Form 442—before the lender issues Clear to Close (CTC).

Regulatory Standard & Underwriting Benchmark (IRC R903.2 Flashing)

  • Governing Guideline: IRC R903.2 Flashing requires the component to be safe, structurally sound, weather-tight, and fully operational at the time of loan closing.
  • Typical Repair Cost: $350–$900 depending on material access and regional labor rates.
  • Expected Field Turnaround: 1–2d from dispatch to completion photos.

Step-by-Step Field Remediation Playbook

1. Pre-Work Scope Matching & Geotagged Before Photos

Before altering the area, match the exact sentence on the appraisal addendum to the physical condition on site. Capture a wide-angle context shot and a close-up Before Photo from the same vantage point the appraiser used.

2. Trade Execution Specification

Interlace new aluminum or galvanized step flashing with each shingle course around the chimney base and tuck/seal counter-flashing into masonry mortar joints.

Ensure all replacement materials are permanent, code-compliant, primed, painted, or sealed to match adjacent finishes, and that all construction debris or paint flakes are completely removed from the site.

3. Underwriting Evidence & Form 1004D Verification

| Verification Layer | Appraiser / Underwriter Requirement | Common Kickback Cause | | :--- | :--- | :--- | | Matched After Photos | Wide context + close-up showing completed finish | Cropped photo with no room/elevation context | | Itemized Invoice | Line item explicitly naming "Chimney Step & Reglet Counter-Flashing Installation" | Vague invoice reading "General handyman labor" | | Workmanlike Finish | Painted, caulked, flush, and permanent | Unpainted wood, raw drywall mud, or temporary patch |


Fast-Track Coordination with AppraisalFix

AppraisalFix connects loan officers, processors, homeowners, and real estate agents with vetted local handymen and licensed trades who specialize in mortgage appraisal repairs and Form 1004D clearance.

Frequently Asked Questions

How fast can chimney step & reglet counter-flashing installation be cleared for a 1004D re-inspection?

Most chimney step & reglet counter-flashing installation callouts are completed within 1–2d of quote approval, allowing the loan processor to order the Form 1004D re-inspection immediately with pre-audited completion photos.

#IRC#Chimney Step & Reglet Counter-Flashing Installation#1004D#roofing exterior envelope
★ Fast 1004D Turnaround

have appraisal repairs holding up a closing?

Get a qualified handyman on-site in 24–48 hours and a re-certified 1004D in days, not weeks.