For Loan Officers

Fannie Mae Appraisal Rules on Accessory Dwelling Units (ADUs) & Illegal Kitchens

Complete compliance and contractor execution playbook for second kitchen stove removal & gas/240v cap-off under Fannie Mae B2-3-04 ADU. Typical cost: $175–$425, turnaround: 24h, with full Form 1004D verification steps.

AT
AppraisalFix Team
November 1, 2026 7 min read
Fannie Mae Appraisal Rules on Accessory Dwelling Units (ADUs) & Illegal Kitchens

Why Second Kitchen Stove Removal & Gas/240V Cap-Off Triggers "Subject To" Appraisal Conditions

When a residential mortgage appraisal is completed under Fannie Mae B2-3-04 ADU, any deficiency involving second kitchen stove removal & gas/240v cap-off shifts the report from "As-Is" to "Subject To" repair or inspection. Unlike general home inspection negotiation items, an appraisal condition tied to second kitchen stove removal & gas/240v cap-off is a hard underwriting gate that must be resolved and verified—typically via Fannie Mae Form 1004D / Freddie Mac Form 442—before the lender issues Clear to Close (CTC).

Regulatory Standard & Underwriting Benchmark (Fannie Mae B2-3-04 ADU)

  • Governing Guideline: Fannie Mae B2-3-04 ADU requires the component to be safe, structurally sound, weather-tight, and fully operational at the time of loan closing.
  • Typical Repair Cost: $175–$425 depending on material access and regional labor rates.
  • Expected Field Turnaround: 24h from dispatch to completion photos.

Step-by-Step Field Remediation Playbook

1. Pre-Work Scope Matching & Geotagged Before Photos

Before altering the area, match the exact sentence on the appraisal addendum to the physical condition on site. Capture a wide-angle context shot and a close-up Before Photo from the same vantage point the appraiser used.

2. Trade Execution Specification

Remove unpermitted second kitchen range, cap the gas line or 240V circuit inside a junction box, and provide photo proof.

Ensure all replacement materials are permanent, code-compliant, primed, painted, or sealed to match adjacent finishes, and that all construction debris or paint flakes are completely removed from the site.

3. Underwriting Evidence & Form 1004D Verification

| Verification Layer | Appraiser / Underwriter Requirement | Common Kickback Cause | | :--- | :--- | :--- | | Matched After Photos | Wide context + close-up showing completed finish | Cropped photo with no room/elevation context | | Itemized Invoice | Line item explicitly naming "Second Kitchen Stove Removal & Gas/240V Cap-Off" | Vague invoice reading "General handyman labor" | | Workmanlike Finish | Painted, caulked, flush, and permanent | Unpainted wood, raw drywall mud, or temporary patch |


Fast-Track Coordination with AppraisalFix

AppraisalFix connects loan officers, processors, homeowners, and real estate agents with vetted local handymen and licensed trades who specialize in mortgage appraisal repairs and Form 1004D clearance.

Frequently Asked Questions

How fast can second kitchen stove removal & gas/240v cap-off be cleared for a 1004D re-inspection?

Most second kitchen stove removal & gas/240v cap-off callouts are completed within 24h of quote approval, allowing the loan processor to order the Form 1004D re-inspection immediately with pre-audited completion photos.

#Fannie#Second Kitchen Stove Removal & Gas/240V Cap-Off#1004D#usda conventional rules
★ Fast 1004D Turnaround

have appraisal repairs holding up a closing?

Get a qualified handyman on-site in 24–48 hours and a re-certified 1004D in days, not weeks.